- 1. Equipment foundations (score: 1)
- Author: "SwampFox" <stevie_g@swampfoxcustoms.com>
- Date: Sat, 27 Mar 2004 13:23:10 -0500
- Any input on materials to use when grouting the foundation for a two post I'm stuck with an unlevel, broom finished concrete floor and have little faith in the plastic shims that came with the lift.
- /html/shop-talk/2004-03/msg00144.html (6,904 bytes)
- 2. Re: Equipment foundations (score: 1)
- Author: Richard Beels <beels@technologist.com>
- Date: Tue, 30 Mar 2004 11:37:02 -0500
- The plastic shims you got are probably the same kind used to level buildings. I have a stack that came from a stadium - used to level concrete columns and slabs. 40 foot concrete columns over 2 feet
- /html/shop-talk/2004-03/msg00145.html (7,536 bytes)
- 3. Equipment foundations (score: 1)
- Author: JNiolon@uss.com
- Date: Tue, 30 Mar 2004 12:37:43 -0600
- from my short stint as a precision alignment engineer... here's my first thing I'd do is take a brick and scrub the broom finish off the floor to make it as smooth as possible and possible level it s
- /html/shop-talk/2004-03/msg00147.html (7,473 bytes)
This search system is powered by
Namazu