- 1. RE: Roll Bar and Questions (score: 1)
- Author: Theo Smit <TSmit@novatel.ca>
- Date: Fri, 21 May 1999 10:59:02 -0600
- I'll take a shot at defining some roll bar terminology. Generally on bolt-in installations, you are required to use 3/16" plates of 20 square inches or larger at each hoop or stay mounting point, on
- /html/tigers/1999-05/msg00367.html (11,402 bytes)
- 2. RE: Roll Bar and Questions (score: 1)
- Author: Theo Smit <TSmit@novatel.ca>
- Date: Fri, 21 May 1999 13:19:03 -0600
- Brad, and Listers, In my opinion it's easier to remove a weld than it is to fill in a drillhole in sheetmetal. One issue with weld-in installation is that you can't paint the bar easily, but a weld-i
- /html/tigers/1999-05/msg00370.html (7,737 bytes)
This search system is powered by
Namazu