Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TR\]\s+TR3\s+assistance\s+requested\s*$/: 3 ]

Total 3 documents matching your query.

1. [TR] TR3 assistance requested (score: 1)
Author: "CFM-TR" <cfmtr3a@verizon.net>
Date: Sat, 18 Oct 2014 08:37:46 -0400
I am looking for images for my project - 1) convertible top bow installation. how the pieces go back together. I have the webbing measurements, etc. also parts schematic which sort of helps. Need a c
/html/triumphs/2014-10/msg00120.html (8,813 bytes)

2. Re: [TR] TR3 assistance requested (score: 1)
Author: "CFM-TR" <cfmtr3a@verizon.net>
Date: Sat, 18 Oct 2014 10:49:10 -0400
For clarification - I mean the top bow installation to the side quarter panel not the webbing configuration. Thanks I am looking for images for my project - 1) convertible top bow installation. how t
/html/triumphs/2014-10/msg00122.html (9,697 bytes)

3. Re: [TR] TR3 assistance requested (score: 1)
Author: "CFM-TR" <cfmtr3a@verizon.net>
Date: Sat, 18 Oct 2014 13:45:21 -0400
Thanks Bill - that is what I needed for the top bow question. I had both sides off and couldn't remember which way was 'front'. Carl Is your question as to where to mount the ribs? If so, this pictur
/html/triumphs/2014-10/msg00126.html (11,169 bytes)


This search system is powered by Namazu