| To: | Albert F Jones <fisher@hctc.net>, Andrew Mace <amace@unix2.nysed.gov>, Jack Levy <jack@cocoinc.com> | 
|---|---|
| Subject: | RE: Quote for repairs, a rip? | 
| From: | "Peter C." <nosimport@mailbag.com> | 
| Date: | Wed, 24 Mar 1999 09:11:34 -0600 | 
| Cc: | Triumph List <triumphs@autox.team.net> | 
| References: | <Pine.SOL.3.91.990323120435.3486B-100000@unix2.nysed.gov><000401be74e4$48ba7fa0$cd7599cf@computer.cocoinc.com> | 
| 
Folks,  
        The times below may be correct for EACH operation handled separately 
(and
bled each time), but as a whole, the time should be less as you'll only
bleed once................. wasn't that a Bond film?
Peter C   still without a triumph
>
>Mitchells states
>
>Clutch Slave cylinder  GT6 R & R  2.0 hrs
>             "                 GT6 O/H   2.4 hrs.
>
>       {R&R Rebuild Clutch Slave 2.5 - 3.0 hrs}
>
>Clutch Master cylinder  GT6 R & R  0.9 hrs.
>              "                  GT6 O/H    1.5 hrs    
>       {R&R Rebuild Clutch Master 1.5 hrs}
>
>Brake Master cylinder GT6 R & R  1.1 hrs
>             "                  GT6 O/H   1.7 hrs
>       {R&R Rebuild Brake Master       2.0 hrs}
>
>Rear wheel cylinders GT6 R & R (2)  1.5 hrs
>Shoes R & R Rear      GT6               2.0 hrs        
>       {Replace rear wheel cyls & shoes 2.0 hrs}
>  
> 
>  Replace (4) brake hoses      1.7 hrs
>  Mitchell doesn't list the clutch line
>       {Replace all 4 brake hoses & steel clutch line 2.0 hrs}
>
>Elizabeth Jones
>Comfort, TX
> 
 | 
| <Prev in Thread] | Current Thread | [Next in Thread> | 
|---|---|---|
| 
 | ||
| Previous by Date: | Re: TR6 Diff Mount Repairs, Dave Terrick | 
|---|---|
| Next by Date: | Wanted: 2 X 634728, Turner & Turner | 
| Previous by Thread: | Re: Quote for repairs, a rip?, BritCarMan | 
| Next by Thread: | RE: Quote for repairs, a rip?, Albert F Jones | 
| Indexes: | [Date] [Thread] [Top] [All Lists] |